In preparation for the future demolition of the building, all hazardous materials, including asbestos, lead-based paint, mold, and window caulking, were safely removed and disposed of. This process was carried out in strict compliance with regulatory standards to ensure a safe and environmentally responsible site. Asbestos was abated from affected areas, lead-based paint was stripped, mold was fully remediated, and window caulking was carefully removed and disposed of. These efforts ensured the building was ready for demolition, meeting all safety and environmental guidelines.