The existing carpet was tarped for protection. Millwork and furniture were removed and salvaged. Single doors in GWB walls and GWB partitions were removed and disposed of. Single-door openings were created in GWB walls. Vinyl flooring, ceramic tile, film, washroom fixtures, and GWB ceiling were removed and disposed of. The existing carpet, ACT, and T-bar ceiling system were removed and salvaged, with disposal completed as required.