Our mission involved the comprehensive removal of existing asphalt surfaces, the dismantling and proper disposal of storm pipe infrastructure, the backfilling of excavated areas with approved materials compacted to meet project specifications, the demolition and removal of the designated exterior wall, and the precision cutting of concrete as required by the project design. All debris was responsibly managed and disposed of in strict accordance with local regulations.