The scope of work included selective demolition and floor grinding to prepare the site for the next phase of construction. Selective demolition involved the careful removal of designated non-structural elements, such as walls, ceilings, flooring, and fixtures, while preserving adjacent areas. Debris was sorted for proper disposal or recycling, with dust and noise control measures implemented to minimize disruption. Floor grinding ensured concrete surfaces were leveled, free of adhesives and coatings, and ready for new installations. Dust control systems were used throughout the process, maintaining a clean and safe environment. The work was successfully completed to meet project specifications, preparing the space for subsequent construction.