This project involved the safe removal of asbestos, the complete demolition of the building at 6 Shipman St, and subsequent backfilling to prepare the site for future use.

The work commenced with obtaining all required permits and approvals, followed by a detailed environmental assessment. Certified professionals conducted the safe removal and disposal of asbestos-containing materials in strict compliance with regulatory standards to ensure the safety of workers and the surrounding environment.

Following asbestos abatement, the demolition phase began with the disconnection of utilities, such as water, gas, electricity, and communication lines. Heavy machinery was used to dismantle the building safely and efficiently. Dust suppression measures, such as water spraying, were employed to minimize airborne particles, ensuring environmental compliance. Materials from the demolition, including concrete, metals, and wood, were sorted on-site for recycling or appropriate disposal at approved facilities.

Once the demolition was complete, the foundations and underground utilities were removed as specified. The site was then backfilled using approved fill materials, compacted, and graded to ensure stability and compliance with project specifications.

This project was completed in adherence to all safety, environmental, and structural standards, resulting in a clean, safe, and leveled site ready for redevelopment or future use.